Map 33 – Sydenham – Lindenwood Pond
Date Effective: Apr. 21, 2023 | Map 33, Edition 30
Illustrated within the map above, a new trail configuration has been instilled on BTC-preserved land.
The Gap Side Trail = 1.1 km
Lindenwood Pond Side Trail = 610 metres
Please note: the new Gap Side Trail illustrated within the map above is not to be confused with the abandoned Gap Side Trail which was decommissioned in Oct 2022 as per the following trail closure post.
abandoned Gap Side Trail