Map 11 – Iroquoia – Kelso Conservation Area, temporary reroute – LIFTED
Date Effective: June 13, 2026 | Map 11, Edition 31

UPDATE Jul. 3, 2026
This closure has been lifted. This segment of the Main Trail within Kelso Conservation Area has been reopened.
__________________________________
ORIGINAL POST Jun. 16, 2026
The temporary closure shown on the map (280 metres) is impassable until further notice while Conservation Halton replaces the boardwalk. An interim bypass is available via the Lac Trail (250 metres), as shown on the map.