Map 10 – Iroquoia – No 1 Sideroad, Temporary Closure – LIFTED
Date Effective: Sep. 8-19, 2025 | Map 10, Edition 31

This closure is no longer in effect.
________________________________
ORIGINAL POST, Sept. 16, 2025:
A section of the main Bruce Trail on No 1 Sideroad, between Guelph Line and Walker’s Line in Burlington, is closed due to road construction (culvert work) from September 8-19, 2025.
There is no alternate route.
For details, see the City of Burlington website here:
https://www.burlington.ca/en/news/road-closure-no-1-sideroad-sept-8-to-19-2025.aspx
(Note: This is in addition to the separate temporary Trail closure at the corner of Guelph Line and No 1 Sideroad.)