Map 8 – Iroquoia – temporary closure, bridge repair
Date Effective: Apr. 17, 2023 | Map 8, Edition 30
A reroute has been instilled to bypass a bridge over a creek that is in need of repair.
The illustrated interim bypass is 1.2 km long.
Currently, the duration of this temporary closure is unknown.