Map 36 – Peninsula – trail reconfiguration
Date Effective: Jul. 10, 2017 | Map 36, Edition 29
The Bruce Trail network displayed within the map above has taken on a new configuration.
The Coveney’s Side Trail creates a 3.2 km loop with the main Bruce Trail.
The Knapp Side Trail creates a 2.5 km loop with the main Bruce Trail.
Main Bruce Trail from points A to B = 3 km
Coveney’s Side Trail = 1.4 km
Knapp Side Trail = 870 metres
McIver Pond Side Trail = 100 metres
McIver Side Trail = 2 km