Due to the Canada Post strike, we are experiencing a service interruption affecting our store and memberships. Details >
Map 2 – Niagara – Woodend
Date Effective: May. 2, 2018 | Map 2, Edition 29
A trail reconfiguration has occurred within Woodend Conservation Area which has taken 410 metres of trail off the roadway through the Conservation Area.
The lengths pertaining to the trail reconfiguration outlined on the map are as follows:
Decommissioned trail = 410 metres
New main Trail = 550 metres
Paul Naray Side Trail = 300 metres
Woodend Side Trail = 130 metres